No Permit Backyard Pods Melbourne
In Victoria a freestanding outbuilding (class 10a, not for sleeping) of up to 10 m² is exempt from a building permit when it is no more than 3 m high (2.4 m within 1 m of a boundary), is the only such building on the lot, is set back at least 9 m from the front street, and is not masonry (VBA practice note BP-01). Our 10 m² pod is designed to fit those limits, and we confirm your site before you order.

Need More Than 10 m²?
A bigger studio or a self-contained unit is a different approval path. In Victoria a small second dwelling of up to 80 m² can be built without a planning permit in many residential and rural zones since 15 October 2026 (Amendment VC306), but it always needs a building permit. Compare the rules in each state in Kit Home Floor Plans’ granny flat size limits by state guide.
When a Pod Can Skip the Building Permit
A pod that meets the exemption conditions needs no building permit, so there are no building surveyor fees or permit wait. A planning permit can still apply under some overlays, so we check your address first.
With Permit
- Building surveyor assessment and wait
- Building permit fees
- Architect drawings required
- Council inspections
- Neighbour notifications
No Permit (Under 10m2)
- 14-day delivery
- No permit fees
- No architect needed
- No inspections
- No neighbour hassles
What You Get
- Full 10m2 usable space
- Fully insulated R6.1
- Double glazed windows
- Electrical ready
- 7 year warranty
No Permit Pod – $22,990 + Installation
Everything you need in 10m2. Perfect for home offices, art studios, music rooms, hobby spaces, or teenage retreats.
Check Your Site
Send us your address and where the pod will go, and we confirm whether it meets the exemption conditions – no obligation.
Ask About Your Site